![]() |
||||||||||
|
Seismic Station: Power Box
New wires had to be fed through the piping that runs from the power box to the ground box to connect the seismometer to the power supply and GPS antenna.
The panel in the above ground power box can be seen as the final connections to the seismometer being tested. Lines run from this box to the ground box and seismometer which, in this picture, both lie directly behind the power box. |
Copyright
© 2000-2006 Lehigh Earth Observatory. All rights reserved.
Questions or Comments? Email leo@lehigh.edu
Lehigh University
31 Williams Drive Bethlehem, PA 18015
(610) 758-4840